Get a quote 425-696-3311

Serving Bellevue and the Eastside Since 2018

Bathroom Remodeler in Bellevue

Hunnu Construction has remodeled bathrooms in Bellevue alongside its kitchen work since 2018 — one crew handling the vanity, tile, flooring and fixtures, rather than a different contractor for each piece.

Before — A bathroom in Juanita, Kirkland before and after renovation — an oak vanity and jetted tub replaced with a lit mirror, light oak double vanity and freestanding tub Before
After — A bathroom in Juanita, Kirkland before and after renovation — an oak vanity and jetted tub replaced with a lit mirror, light oak double vanity and freestanding tub After
Juanita, Kirkland · oak and a jetted tub to a lit mirror and a freestanding tub

What "Bathroom Remodeling" Means at Hunnu Construction

A bathroom remodel can mean one thing changing or all of them. Hunnu Construction has run both kinds since 2018 — a single vanity swap into a bathroom that's staying otherwise the same, and full renovations that take a bathroom down to the subfloor and rebuild it around a new layout. What doesn't change is who does the work: one team handles the design consultation, the vanity, the tile, the flooring and any shower or tub work, rather than the homeowner coordinating a different specialist for each.

That matters most in the handoffs, the same way it does in a kitchen. A floor sealed before the shower pan is set, a vanity installed before the wall tile height is confirmed, a schedule where the tile setter and the plumber both show up the same day because nobody was tracking the other — these are the failure points of a bathroom run by committee. Sequencing the trades in the right order, with one team accountable for how they fit together, is most of what "project management" means on a bathroom job the same as it does in a kitchen.

A Second Room, the Same Crew

Hunnu Construction is based in Bellevue and has worked across the Eastside and into Seattle since 2018 — the same service area for bathroom work as for kitchens. A bathroom's failure points differ from a kitchen's in specifics — moisture and waterproofing matter more here than almost anywhere else in the house — but the underlying approach is the same: an in-home consultation to measure the actual space, not a generic layout, followed by one crew carrying the project through to the final walkthrough.

Households already familiar with Hunnu Construction's kitchen work sometimes ask whether the same crew handles bathrooms too. It does — the two are run as separate projects with separate scopes, but the same design-consultation-first approach, the same single point of contact, and the same one-quote-covers-everything model apply to both.

An interior designer reviewing Hunnu Construction on Thumbtack in 2019 wrote: "I'm an interior designer and I've done 5 bathroom projects with them." Five bathrooms with the same crew is a different kind of recommendation from a single happy homeowner, because the designer's own name is on the result every time.

How a Bathroom Remodel Runs

  1. Week 1

    Design Consultation & Material Selection

    An in-home visit to measure the space and choose the vanity, tile, flooring and fixtures together — as one bathroom, not a set of separate decisions made room by room.

  2. Week 2

    Demolition & Rough-In

    The old vanity, tile and flooring come out. Anything behind the walls that needs to move for the new layout — plumbing for a relocated drain, electrical for a new fixture — gets rerun before anything new goes back in.

  3. Weeks 3–4

    Vanity, Tile, Floor & Shower or Tub

    The vanity goes in first so counter and sink are set against a fixed reference point, then tile, flooring and any shower or tub work finish the room in the order that protects each surface from the trades after it.

  4. Final Week

    Walkthrough & Punch List

    A walkthrough of the finished bathroom together, checking fixtures, water pressure and finish work before the crew calls the job done.

One Company, or Several

Aspect Hunnu Construction Hiring Separate Contractors
Who you call One team, one number, from the design consultation to the final walkthrough.A separate company for the vanity, the tile and the plumbing — you manage every handoff between them.
Scheduling One crew sequences the whole job so each trade isn't waiting on the last.Each contractor works their own calendar; a delay in one trade pushes back every trade after it.
Design consistency Vanity, tile, flooring and fixtures chosen together as one bathroom.Each specialist solves their own piece; matching finishes across all of them is left to you.
Pricing One quote covers the whole project.A separate quote — and a separate invoice — from every trade involved.

Finished work

Five Bathrooms, Before and After

Jobs in Kirkland, Redmond, Renton, Edmonds and Bellevue — photographed on site, not staged.

Bathroom Remodeling Services

Five ways to work with Hunnu Construction, from a full renovation down to a single trade.

Bathroom Renovation

When the vanity, tile, flooring and fixtures all need to change together — not just one surface — that's a full bathroom renovation in Bellevue. It starts with the same design consultation as any project here: measuring the room, discussing how the bathroom actually gets used, and choosing finishes as one space rather than several unrelated decisions.

Renovation work also covers the structural and rough-in changes a smaller project doesn't touch — moving plumbing or electrical behind the walls, then rebuilding around the new layout.

A finished primary bathroom with a blue marble walk-in shower, double vanity and freestanding tub under a skylight

Bathroom Vanity Installation

A vanity is cabinet, countertop, sink and faucet as one unit, which is why bathroom vanity installation is usually scoped and quoted together rather than as four separate trades the way kitchen cabinets and countertops are. The existing vanity comes out, the new one is set level and secured, and the countertop and sink go on once it's confirmed in place.

A vanity swap doesn't have to mean a full remodel — it runs as its own standalone project just as often, with the tile and flooring around it left exactly as they are.

A finished double walnut vanity with two mirrors against a stacked stone wall

Bathroom Floor Replacement

Bathroom floors take constant moisture exposure that a kitchen floor doesn't, which makes subfloor condition even more worth checking honestly once the old material is up. A bathroom floor replacement means the old flooring comes out, the subfloor is checked for water damage and leveled where it needs it, and the new material goes down sealed against the fixtures around it.

This runs as a standalone project when the vanity and tile are staying — the floor is fit around what's already there rather than requiring the whole room to come apart.

A bathroom with a patterned black and white cement tile floor

Bathroom Tile Installation

Shower walls and bathroom walls take more daily water exposure than almost any other tiled surface in the house, which is exactly why waterproofing behind the tile matters as much as the tile itself. bathroom tile installation covers both — the wall tile a bathroom is actually seen for, and the waterproof membrane behind it that decides whether the installation lasts.

Like a floor or vanity swap, a tile update runs as its own project when the rest of the bathroom is staying put.

A tub and shower surround in blue fan-shaped tile with brass fixtures

Tub-to-Shower Conversion

Replacing a bathtub with a walk-in shower is one of the most requested single changes in an older bathroom, and it's different work from installing a new shower where one already exists — a tub-to-shower conversion means removing the tub, extending or rerouting drain and supply lines to the new pan location, and waterproofing a stall where a tub surround used to do that job.

It's usually done as its own focused project rather than folded into a full renovation, since the vanity, floor and rest of the room can stay exactly as they are.

A walk-in glass shower with a wood feature wall and a pebble floor

Also Serving Kitchens

Bathroom remodeling runs alongside the kitchen work covered on the main site, not instead of it — the same crew, the same design-consultation-first approach, and the same single point of contact apply to both. For kitchen and bathroom remodeling in Bellevue, including the five kitchen remodeling services and how a project runs from consultation to walkthrough, see the main kitchen remodeling page.

Why Bellevue Chooses Hunnu Construction

One Crew, Start to Finish
The vanity, tile, flooring and any shower or tub work are handled by the same team, from the first measurement to the final walkthrough — not handed off between separate contractors partway through the job.
Kitchen and Bathroom, One Number
Hunnu Construction handles both kitchens and bathrooms, so a household planning more than one room doesn't need a second contractor search — one design consultation can cover both if that's what the project needs.
One Quote, Transparent Timelines
A bathroom remodel gets one quote covering the whole project — vanity, tile, flooring and fixtures together — and a timeline laid out before work starts, rather than a running total that grows every time a new contractor adds their own estimate.

Get a Quote

Start a Bathroom Remodel in Bellevue

Tell us about the project and we'll follow up to schedule an in-home design consultation.

or call 425-696-3311

Bathroom Remodeling Questions

What's included in a full bathroom remodel with Hunnu Construction?
A full remodel covers the design consultation, vanity installation, tile, flooring and any tub-to-shower conversion as one project. The same crew handles every trade in sequence, from the first measurement through demolition, rough-in, installation and the final walkthrough.
Can you do a tub-to-shower conversion without a full remodel?
Yes — it's usually its own standalone project. The vanity, floor and rest of the bathroom can stay exactly as they are while the tub is replaced with a shower.
Can you install a new vanity without redoing the whole bathroom?
Yes. Vanity installation runs as its own project as often as it runs inside a full renovation, and the tile and flooring around it are left untouched.
How long does a bathroom remodel take?
It depends on scope. A full renovation — demolition through vanity, tile, flooring and any shower work — typically runs several weeks. A single trade like a vanity swap or a floor replacement is a shorter, standalone job.
Do you also do kitchen remodeling?
Yes — Hunnu Construction has handled kitchen remodeling since 2018, and bathroom work alongside it. A household planning both can cover them in the same design consultation.
What areas do you serve for bathroom remodeling?
The same service area as kitchen remodeling — Bellevue and the Eastside, including Renton, Bothell, Redmond, Issaquah, Kirkland, Sammamish, Shoreline and Woodinville, plus the Seattle neighborhoods of Ballard and Magnolia.
What forms of payment do you accept?
Checks and cash. Hunnu Construction does not currently accept credit or debit cards, so it's worth planning payment around that before a project starts.
What are the most common bathroom remodel mistakes to avoid?
Skipping or shortcutting waterproofing behind tile is the one that causes the most damage down the road, since it's invisible until it fails. Choosing fixtures before confirming the plumbing rough-in can support them is a close second.